On 09-12-2015 NCGS Group successfully loaded out the 2,000 mt topside of the LAM-E project. The integrated topside is loaded on the new TB-6000 barge of NCGS Group. The TB-6000 barge operates in the Caspian Sea and has the capacity to launch 4,000 mt jackets and install 6,000 mt topside by means of the float-over method. NCGS Group manages these T&I Services in-house with an integrated Project Team.